One factory.
One operational truth.
Follow every tyre from building through transit and curing. See production, losses and verified engineering gains without confusing the evidence with another process.
Five teams. The same evidence.
Compare output against the 105-tyre target while retaining the machine, fault and downtime context behind each result.
Ten tyre-making machines, clearly identified.
Output, current state and principal loss are visible by machine for the selected date range.
Start with the largest loss. Drill into the cause.
What happened, where and what it cost
Record the change. Measure the result.
SIGNAL compares production before and after each modification so engineering improvements—and unintended losses—remain visible.
Average output increased from 99 to 107 tyres per shift across 15 comparable shifts.
Mechanical stoppage reduced by 22 minutes per shift after commissioning.
Tyre-hotel congestion increased. Change flagged for engineering review.
Follow the evidence before blaming the shift.
Team Delta is below target. Ask Watson whether the team, CT-03 or the Tyre Transit System best explains the loss.
Select a question—or ask your own—to begin the investigation.
More output, with no new equipment.
A Pareto-driven approach across all departments increased output from 80 to 105 tyres per shift.
The same discipline, applied to a different process.
Each example has its own equipment, measures and loss model. The production data remains separate.
- Oven-zone temperature deviation
- Dough-weight quality faults
- Recipe and allergen changeovers
- Packaging film and checkweigher stops
- Cycle time by machine and component
- Tool-life warnings and tool changes
- Setup time and first-off inspection
- Machine alarms, scrap and rework causes